Parametric Value at Risk Under a Factor Risk Model
Last updated: November 29, 2026
Quick Overview
Given a portfolio's factor exposures, a factor covariance matrix and security-specific variances, derive the one-day 99% parametric VaR, decompose it into factor and specific parts, and compute each position's contribution.
BlackRock
November 29, 20260
0
0 solved
Given a portfolio's factor exposures, a factor covariance matrix and security-specific variances, derive the one-day 99% parametric VaR, decompose it into factor and specific parts, and compute each position's contribution.
BlackRock's Financial Modeling Group builds the factor models behind Aladdin risk. A quant onsite would ask the candidate to derive VaR from the model, show that the decomposition adds up, and state the assumptions that break in a crisis.
What the Interviewer Expects
- Writes portfolio variance as factor plus specific variance
- Converts volatility to VaR with the normal quantile
- Derives Euler contributions that sum to total risk
- Works a small numeric example correctly
- Names the limits: fat tails, non-linearity, unstable correlations
Key Topics to Cover
How to Approach This
- Define your hypotheses (H0 and H1) clearly before performing any test.
- Calculate required sample size BEFORE running an experiment, using power analysis.
- Remember the Central Limit Theorem: sample means become approximately normal with large n.
- Watch for Simpson's paradox. Always segment data by key dimensions.
- Distinguish between statistical significance and practical significance.
Possible Follow-up Questions
- How would you scale a one-day VaR to ten days, and when is the square-root rule wrong?
- How do options in the portfolio change the approach?
- How would you backtest the VaR model?
Sharpen Your Skills on Codemia
Practice similar problems with our interactive workspace, get AI feedback, and track your progress.
Browse Statistics QuestionsSample Answer
Clarify
Returns follow with factor covariance and diagonal specific variance . Portfolio weights , so exposures are . Assume zero mean over one day, normal ret...
Approach
Variance . VaR at confidence is , with . Because is homogeneous of degree one in , Euler give...