Functional Requirements:
Non-Functional Requirements:
Development of the Employee Swap System can be divided into several phases, including front-end and back-end development, integration, and testing. Here’s a rough estimation:
Total estimated time: 9-13 weeks, depending on team size and expertise.
The API will provide endpoints for critical operations. Here's a list of proposed endpoints:
GET /shifts/available - Retrieve available shifts for swapping.POST /shifts/requestSwap - Request a shift swap with another employee.GET /shifts/pendingRequests - Get a list of pending swap requests.PUT /shifts/approveSwap - Manager's endpoint to approve a swap request.Each endpoint must return appropriate HTTP status codes to indicate success or failure.
The database schema will consist of a few key entities:
Adding indexes on frequently queried fields like employee ID and shift date will improve performance.
The high-level architecture consists of several components working together:
This structure allows for scalability and redundancy, ensuring high availability.
The main request flow for processing a shift swap is as follows:
The system can be broken down into the following major components:
The system design faces several trade-offs:
Possible failure scenarios include:
Regular performance testing and monitoring can help in early detection of such issues.
Future enhancements can include:
Continuous feedback from users can guide prioritization of these improvements based on actual needs.